Mullingar Athletic Football Club is excited to announce the launch of a Facilities Development Plan 2020-2023 consisting of 4 phases aimed at enhancing and adding to the club’s existing facilities .
Phase 1 will commenced in March 2023 with the construction of a new artificial surfaced all-weather pitch for 7-aside games on the current sand-based training area. The main club car park will also receive a full macadam surfacing, while new fencing will be added to the road boundary along the road frontage. The plan also includes the construction of new player dugouts on Pitch 2, Pitch 3, and a full-size 3G all-weather pitch.
Phase 2 of the plan will focus on the development of a new full-size 4G artificial grass all-weather pitch, complete with floodlights. This will be constructed on the north-west side of the site, alongside the existing 3G full-size all-weather pitch. This phase of the plan also includes the extension and surfacing of the existing overflow car park on the south-east side of the site in Gainstown.
Phase 3 includes the extension of the current club house building to incorporate four additional dressing rooms, a gym area, kit rooms, and a club merchandising shop. A skills ball wall will also be constructed.
Phase 4 of the plan will see the construction of a spectator stand overlooking the main grass pitch, as well as an exercise walkway throughout the facility.